Contract Profile
-
Client
Lamprell
-
Location
Sharjah, UAE
-
Services
Energy Saving Services and Solutions
-
Annual Energy Savings
1.7 GWh
Challenge
Lamprell engaged with ENGIE Solutions to assess the opportunities for reducing the energy consumption of their facilities. After going through the detailed energy audit process, ENGIE Solutions identified a list of energy conservation measures (ECMs) for the two facilities at Hamriyah and Jebel Ali. The main challenges and focus areas were the air conditioning, HVAC controls as well as the optimization of the production process and especially the compressed air system.
Solutions
After completing a detailed energy audit and identifying the most cost-effective energy conservation measures, ENGIE Solutions was appointed by Lamprell.
The energy conservation measures implemented at Lamprell included the following:
- Air conditioning
- Installation of HVAC controls
- Optimization of the compressed air system