Contract Profile

  • icon

    Client

    Confidential

  • icon

    Location

    UAE

  • icon

    Services

    Utilities-as-a-Service

  • icon

    Terms

    10 Years (BOOT contract)

  • Annual CO2 Reduction

    28%

  • Energy Savings

    15%

thumbnail-cement-1-pichi

Summary

A leading industrial company signed a 10-year BOOT (Build Own Operate Transfer) contract with ENGIE Solutions to design, finance, construct and manage operations of a 10MW Waste Heat Recovery (WHR) system at their cement factory site in the United Arab Emirates.

ENGIE Solutions is implementing the Organic Rankine Cycle (ORC) technology in an “utilities-as-a-service” model in the cement industry for the first time in the region. ENGIE’s energy-as-a-service model means guaranteed energy ef ciencies, higher reliability, and resiliency, with no major capital outlay.

The ORC system, based on a closed-loop thermodynamic cycle, will help the client avoid 29.2 kilotonnes per year of CO2 – representing a reduction of 28.35% in power-related emissions and a 3.9% reduction in total plant emissions.