Contract Profile

  • icon

    Client

    Wyndham Hotel

  • icon

    Location

    Dubai, UAE

  • icon

    Services

    Energy Saving Services and Solutions

  • Annual Energy Savings

    AED 666,127

  • Payback Period

    1.34 Year

  • Energy Savings

    20%

wyndham-dubai-marina-hotel-uae-exterior

Challenge

ENGIE Solutions and First Central signed an agreement to implement energy savings solutions at Wyndham Dubai Marina Hotel to help reduce annual energy bill by 20%. The challenge and main objective was to ensure that hotel guests were not disturbed during this project.

Solutions

ENGIE Solutions proposed the below solutions to ensure Wyndham Dubai Marina Hotel can reach its energy savings potential

  • Install an advanced chiller plant optimizer
  • Install a wet wall system
  • Install VFD on FAHU
  • Install VFD on the main kitchen’s exhaust fan and makeup air unit

The project comprised of the implementation, operation and maintenance of different energy conservation measures at Wyndham Dubai Marina for five years.